DataCenter
Speculative
Silicon Valley HPC Site
CA, USA
A speculative 250 MW HPC/AI compute site in Silicon Valley, facing significant power availability challenges in PG&E territory.
Signal Score
50
/100
250 MW
Estimated Capacity
$2.0B
Estimated Investment
35%
Confidence
Evidence Sources
Overview
Timeline
2026-07-05, PG&E large load inquiry, signal
2026-05-15, CAISO cluster study initiated, signal
2026-04-01, First signal detected, initialSignal
Infrastructure Requirements
- substations
- 230kV transmission
- battery storage
- on-site generation
Commercial Opportunities
- battery storage systems
- substation equipment
- backup generation
Known Partners
P
PG&E (probable)
C
City of San Jose