DataCenter
Possible
Arizona Solar + Battery Campus
AZ, USA
A 400 MW data center campus in Buckeye, Arizona sourcing significant behind-the-meter solar and battery storage. Leverages Arizona's rapid solar deployment and available land.
Signal Score
60
/100
400 MW
Estimated Capacity
$3.2B
Estimated Investment
45%
Confidence
Evidence Sources
Overview
Timeline
2026-06-25, APS load study completed, signal
2026-04-01, Solar + battery PPA discussions, signal
2026-02-01, First signal detected, initialSignal
Infrastructure Requirements
- substations
- 230kV transmission
- solar farm
- battery storage
- backup generators
Commercial Opportunities
- solar panel supply
- battery storage systems
- substation equipment
- transformer supply
Known Partners
A
APS
C
City of Buckeye
Source Evidence
Location
Interactive map loading...
,